|
Place an Ad |
|
Back | Next
From: Click here to reply to [anonymous]@gmail.com
|
Date: Saturday, November 07, 2009 Category: Region: Description: 2001-2002 Hawiyah Gas Plant Project (Administrative Assistant). 2002-2003 Haradh Gas & Oil Separator Plant. (Drawing & Document Controller, Vendor & Design Drawing). 2003-2004 Qatif Producing Facilities Projects at Berri Gas Plant. (Drawing & Document Controller, Vendor & Design Drawing. 2004-2005 Seawater Conversion Project (IT/Administrative Assistant). 2005-Present Communication Projects Division (Assistant Engineer/Material Coordinator).
|
Email to a Friend Back | Next Problem with this ad? Please click on one of the following: Miscategorized | Prohibited* | Spam © 2009 expatriates.com
* As prohibited by our terms of use
Posting ID:6797388
|
|||||||||