Riyadh / Saudi Arabia A [email protected]
Summary Dedicated Senior Civil Engineer
of multistory buildings and supervision of infrastructure projects, i
bridges, roads, and drainage systems. Skilled in ensuring that construction
projects meet specified standards and requirements through a systematic
process.
Experience Site engineer
Construction a
mosque- houses
Inspect
of work.
Coordinated and supervised
Managed and directed
Implemented
Prepared
Enforced
Monitored project costs and ensured
Ensured
regulations.
Senior engineer in bridges department
and infrastructures // Khartoum State//
Construction
(Al mansheya bridge
and Soba bridge)
Construction
2008-2012
and Afraa Tunnel
Work
Civil Engineer
h m e d imam12@00966508103176
with 20 years of experience in the construction
in several projects in Sudan
and maintenance of multistory buildings (bank
-…) in Khartoum state and other states in Sudan.
Inspected and assessed construction site before the commencement
construction activities
construction workers and subcontractors
and maintained quality control procedures.
reports on project progress, challenges, and solutions.
safety standards and protocols on the construction site.
itored adherence to the budget.
that construction activities comply with environmental
// Ministry of water
2004
supervision of five River Bridge in Khartoum state.
bridge, Al Halfaia bridge, Al Mak Nimer bridge, Tutty bridge
supervision of four over and under pass
(Kobar flyover, Wad Albashir flyover, Central Market flyover
under pass)
Worked closely with engineers and designers to develop detailed
508103176
including
2000-2004
nd bank-hospitals –
…) activities.
ol herence 04 – 2012
2004-2010
, in Khartoum state
r,
project plans and specifications and ensured that the project design
complies with relevant regulations and standards..
Reviewed calculations, drawings, and specifications for accuracy
and completeness.
Conducted tests on construction materials (concrete, steel, asphalt,
etc.) to ensure they meet the required quality standards.
Regularly inspected construction activities to ensure they adhere to
the approved plans and specifications.
Monitored workmanship, construction methods, and compliance
with safety regulations.
Developed and implemented quality control plans outlining
procedures, responsibilities, and inspection points throughout the
construction process.
Performed non-destructive testing and inspections on critical
components.
Documented any deviations from the approved plans and
specifications and track corrective actions.
Ensured compliance with local, state, and national building codes
and regulations.
Director of Studies in bridges department 2014 – 2018
Assistant Director of Head Office in bridges department
2018 - 2023
Skills
Technical Competence // Problem Solving // Communication // Materials
Knowledge // Computer programs ( AutoCAD, SAP2000, Primavera P6, Abaqus,
Spss, Ansys, advanced Excel ) // Critical Thinking // Ethics and Professionalism
// Continuous Learning.
Education
M.Sc.in civil engineering (bridges) July 2008
College of graduate study & Scientific researches –Karary University –Sudan
Bachelor of Science (Honors) in civil engineering July 2000
Faculty of engineering and architecture – Khartoum University
Training &
courses
PMP and CAPM preparatory course (X.PERT ACADEMY).
X-SIM Managing by project(MBP) Simulation(X.PERT ACADEMY)
Feasibility studies preparation and analysis
Construction contract, operation system of Boot Project.
Geometric design of inner ring road intersection in Khartoum state
(Istanbul/Turkey-2003).
Tensile test for strands of pre-stress concrete- (Dubai-2005).
Pre-stress concrete for building and bridges (Egypt-2006).
Bridge design, construction and maintenance (Khartoum University).
Traffic engineering course.
Construction methods of several types of bridges. Manufacturing of steel girders for Alhalfia bridge (karabok/Turkey-2008).
Welding, welding control and (NDT) IN welding training (Turkey-2008).
Magnetic Particle Testing (Inspection technology centre).
Ultrasonic Testing (Inspection technology centre).
Bridge design according to lrfd design method.