Immediately Looking For Job Senior Quantity Surveyor With 25 Years

I have total 25 years’ Experience of different Projects in field & office work. Mainly my worked
experience is more than 14 years as a “Quantity Surveyor “for all Civil Construction works
along with knowledge of electro-mechanical (MEP) related Quantities, it also includes the
preparation of B.O.Q, Breakdown & Rate Analyses of the project. I have worked in Tendering
& Contracts Department.
While other 10 years field Experience for execution of construction activities as a Site Civil
Engineer, where my duties are also included to check the Quantities at Site & to prepare the
Payment Certificates for our Company & Subcontractors.
Out of my total 24 years’ experience I have worked 14 years in Saudi Arabia &10 years in
Pakistan as it is evident from my C.V.
I use computer extensively for all activities.
Total Relevant Experiences
11/2018 – Present
Senior Quantity Survey Engineer at Kaden Investment Group (Riyadh)
Project cost = 370 million Saudi riyals Client: Kaden Investment Group
Currently I am Working in Head Office with Procurement & Contracts Department. We are
working for Two Major Projects (Logistics Park & Riyadh Front Near Airport),
In Riyadh Front Project There are two Phases, Phase-1 is Consists of 12 Office buildings
each building have three/ four stories with Latest Interior Design and Finishes and Hotels
which is called Business Front ,while Phase -2 consists of many shops , where house, hotels
with latest interior / exterior Design and finishes and large infra-structure work including Pre
cost buildings, Pre-engineering and frame structure Buildings
Main Responsibilities
1- Preparing Bill of Quantity from Design Drawings for Frame Structure
Building, Pre-Engineering and infra structure work of Projects.
2-Responsible for checking and verifications of all invoices of the said sub
packages on site
3-Responsible for on-site and off-site quantity verifications and confirmation with
regards to payments and variation works.
4- Undertake market review / research for compiling and updating unit rates for estimating.
5- Responsible for organizing measurement tasks when preparing estimates / cost plans.
6- Draft estimates / cost plans for review and finalization with senior management.
7- Maintain a register of payments.
8- Prepare and maintain records of all sub-contractor’s agreement and payments.
9- On site verification of Final Accounts submitted by the Contractors and selected Sub
Contractors and Suppliers, adjusting as necessary and providing recommendations to the
Client.
10- Carry out cost estimates for alternative design solutions.
MEP Quantity Surveyor
The Institute of Business,
Engineering & Technology (PVT).
(TIBET) Colombo - Sri Lanka.
2023
Certification of AssocRICS-2023
Technical Skills
Microsoft Office Applications
AutoCAD, 3D Civil
Familiar Documents
Principle of Measurements
(POMI)
FIDIC 1999 (Red Book)
Language
Urdu: Native Language
Arabic: Good
English: Advanced
Nationality: Pakistani
Date of Birth: 22-07-1976
Refrence:
11- Checking the Variation orders, Claims, Checking Rate Analysis for New items,
12- Take off the Quantities for Procurement work / Material Order
13- Prepare estimates of variation works.
1/2018 – 11/2018
Senior Quantity Survey Engineer at China Railway Contraction Corporation
Limited-Saudi Branch (Riyadh)
Project cost = 9 Billion Saudi riyals Client: MOI
I Was Working in Project Control Department, This Project is Consist of Many Proto Type
Buildings, in Different Locations of the Kingdom, Some Building are Typical and some are
totally different like Masjid, Ware house, Cafeteria, Barracks, Office Building, Junior Officer
Building, Etc. There was Lot of Infra Structure work for each site
Worked as Senior quantity surveyor. Main Responsibilities To Work for 02 Sectors for
Area A2 & A4 (Site 326) to Take off Quantities for Revised Bill of Quantity of all Projects
Coming Under the Two Areas, preparing the Takeoff Sheets for Payment Certificates to
Submit the Consultant for Verification of Quantities, Preparing the Variation orders, Claims,
Preparing Rate Analysis, Quantity Take off for material order for the projects, Checking the
Payment Certificates of Sub Contractors for Sector 1 & 2 Directly Under the Chines Sector
Manager & Project Manager
Preparation of Comparison Sheets for Contracts and Procurement Department
6/2015 – 10/2017
Al Rajhi Saudi Group Saudi Arabia (Riyadh)
Project cost = 120 million Saudi riyals Client: Mosanada Eskania
Specifications; This is Labor Housing Project in 2nd Industrial City Jeddah Under MODEN
Consists of 44 Buildings ,Each Have 04 Story But This Project Completed Partially, Only 09
Buildings Are Completed Including Two Service Buildings (Service Building-1 Administration
building, In This Building There is Big Laundry, Storage area, Gym area, Maintenance Hall and
Service Building # 2 Having Big Kitchen on Ground and 1st Floor and 3rd & 4th Floor for Serving
area for 1200 persons at a time, More over Chilled Water System was Installed Above This
Building for Whole Phase -1 (22 buildings )06 Chillers with Cooling Towers Are Installed With
All MEP Work Worked as Senior quantity surveyor. Main Responsibilities are take-off
quantities for Preparing Bill Of Quantity, Preparing the breakdown for monthly payment
certificate, monthly progress report, man power reports, preparing subcontractor progress
payments, visiting at site for getting update information for site, preparing the variation orders,
preparing comparison sheets for quantities ,Attending the Meeting With Sub Contractors Discuss the Work Progress for Current Month and Work Plan For Next Month and Their
Payment Certificate Schedule
6/2007 – 6/2015
Saudi Lebanese Modern Construction Company Saudi Arab (Riyadh)
During the work I have completed the following projects
Academic Canter in Riyadh medical Complex
Project cost = 22 million Saudi riyals Client: Ministry of health
specifications; This was a multi-story building having an Amphitheatre hall in ground floor with latest systems, there was double
tee slab for roof at all floors, external finish is structural glazing at all elevations
Worked as quantity surveyor. Preparing monthly payment certificates, monthly progress report, man power reports, preparing
subcontractor progress payments, visiting at site for getting update information for site, preparing the variation orders, preparing
comparison sheets for quantities which item is deleted and which is new item approved, cost analysis for different item of B.O.Q,
Submitted progress payment to client for approval
2- Diplomatic Makarim Hotel in Diplomatic area
Project cost = 122 million Saudi riyals Client: Sharako
This is a 4-story hotel with latest finishes, having a swimming pool at 3rd floor, space frame roof system
Worked as quantity surveyor, preparing claims, variation order for civil and electromechanical works, preparing monthly
payment certificates, monthly progress report, man power reports, preparing subcontractor progress payments, daily progress<