Experienced Planning Engineer With Over 7 Years Of Expertise In Project Planning,

Prepare and develop resource- and cost-loaded Baselines, Recovery, and Revised
Baselines, as well as Mitigation Plans and One-Month Look-Ahead schedules.
 Manage and monitor project timelines, identifying critical paths to ensure timely
achievement of project objectives.
 Develop comprehensive project schedules, resource allocation plans, and risk mitigation
strategies to optimize overall project performance and efficiency.
 Anticipate potential counterclaims and perform retrospective analyses for Extension of
Time (EOT) claims.
 Develop, maintain, and regularly update project schedules using Primavera P6 and
Microsoft Project.
 Identify and analyze potential risks impacting project schedules and propose effective
mitigation strategies.
 Review BOQ, drawings, and scope of work to prepare detailed baseline schedules and bar
charts for all project phases—Engineering, Procurement, and Construction (EPC).
 Develop and maintain short-term schedules (2–3 Week and 2–3 Month Look-Ahead) based
on the approved Baseline Construction Schedule and available resources (manpower,
materials, and equipment).
 Prepare detailed Level 3 or Level 4 Baseline Schedules in coordination with the project
team, including timeframes, resource histograms, submittal logs, and cost loading.
 Prepare S-Curves, daily, weekly, and monthly progress reports for client submission.
 Conduct equipment and manpower productivity analysis and perform Earned Value
Analysis (EVA) to assess project performance.
 Monitor and control the progress of subcontractors across various disciplines to ensure
alignment with the overall schedule.
 Identify variances between the planned and actual progress and recommend corrective
actions.
 Report regularly to the Planning Manager regarding project progress, deviations, and
recovery strategies.
 Participate in project coordination meetings and discussions with clients and internal teams
as required.
 Update weekly progress data for Civil, MEP, Procurement, and Engineering activities.
 Ensure project schedules are planned and executed in a safe, cost-effective, and timely
manner with optimal productivity.
 Attend internal planning meetings to review and update project progress and forecasts.


Back Next