Career Objective
Seeking a position with company in which to grow and excel in this profession, and make use of all the opportunities I get to learn latest developments in the field.
Professional Experience.
Works Specialized in Welding Supervisor & Bolt Torquing, Hydro test, Paint
Touch up, RTR Fire water line & Foam water line, General Product line, Industrial Drainage(Sump) and Feb Shop Supervisor NDT Level II . I am ready for WPR Exam.
My Iqama is Transferable.
TOTAL EXPERIENCE OF GULF 13 years 02 months
Presently working with
(1) ( A Yousuf Bin Ahmed Kanoo Company )
Project :
Project : Abqaiq , Dew Point Control Unit ( DPCU ) (Saudi Aramco )
Work with L&T 7th September 2023 to 25th October 2025 .
Welding Supervisor.
(2) Construction & Roads Services Est. ( CRSE )
Ajyal Saudi Aramco project Dehran 1st June 2023 TO 2nd September 2023.
Fire water and Fire Fighting Line and installation of Fire hydrant .
Completed this project April 2023
Construction & Roads Services Est. ( CRSE )
Project : AL - Jouf Bulk Plant , Saudi Aramco( Saudi Arabia oil & Gas company )
Welding Supervisor ,Bolt Torquing ,Hydro Test , Paint Touch up,
RTR ,Mechanical Fab Shop Supervisor Three Years , Five Months ( 9th October 2019 TO June 2023 Completed this project.


(3) ENERGY ENGINEERING SERVICES FACTORY (EES VESSEL HEADS)
AL-JUBAIL INDUSTRIAL CITY 3196 KINGDOM OF SAUDI ARABIA
Mechanical Work Shop Supervisor , Welding Supervisor Seven Years Three month's
( 7th November 2012 to 30th September 2019 )

Field of Operation
Knowledge of Welding Process
• SMAW, GTAW , GMAW (MIG, MAG), SAW ,FCAW.
• Knowledge of Welding Procedure Specification (WPS).
• Testing of all Welders for Performance & Qualification Test (WPQT) and coordinating with Client for welder qualification.
• Knowledge of Welding Consumable Preservation as per Aramco Standard.
• Preparation of Daily Welding Production Report .
• Knowledge of Procedure Qualification Record (PQR).
• Welder Qualification Test (WQT) report.
• To check the before fit up stage all marking & cutting as per calculate dimension.
• To inspect joint fit-up of each joint and making fit-up inspection reports.
• To maintain the Inter pass Temperature.
• Inspections before welding, during welding and after welding.
• Preparation of fit up & weld visual report.
• Monitored the fitting, burning and welding processes to avoid overheating parts , warping , shrinking , distortion of materials .
• Set up equipment and welded parts according to welding chart specifications and type.
• Followed all safety guidelines, including proper machine guarding and lookout and tag out procedures.
• Inspected chains, hammers and other tools for damage or wear to prevent injuries and accidents..
• Production procedure.
• Selection of certified welder.
• Tool repair and maintenance.
• Stamping die repair and builds.
• Fabrication processes..
• Forklift operation.
• Detail oriented.
• Employee performance reviews.
• Equipment problem resolution.
• Planning of NDT activities and review of reports.
• Interpretation of radiography film.
• To see the PWHT requirements of joints and to witness during PWHT.
• Thickness Gauging.
• Visual inspection on the welding.
• Liquid penetrate testing done all type of weld as per ASME specification.
• Radiography film interpretation and report.
• Calibration of UT thickness meter & MPT Machine.
• Reviewing Test results and reporting same to the senior inspector.
• Prepared daily Inspection reports.
• Preparation of Internal punch list.
• Prepared NDT reports.
• Maintain and ensure good plant housekeeping.
• Performed regular inspections on dimensional accuracy and discontinuities and record all observation..
Knowledge of Hydro Test
• Responsible for safety of all personnel involved in the operation.
 Utilized hand tools such as large torque wrenches, air impact guns, and gauges.
 Inspected hydro-test equipment and instruments.
 Verified that all pressure gauges & Safety Valve are calibrated before started hydro test.
• Verified that all test specs and safety procedures were applied correctly.
• Pressurized mass water storage units using high pressure water lines.
 Assist operator in pressure testing manifold bop etc.
 Bolt up flanges on pipeline.
 Activated air compressor or water pump until gauge registers specified internal pressure.

Knowledge of Paint Touch up

 Selection of paint as per required.
 Knowledge of sand blasting & Bristle cleaning.
 Knowledge of Joint cleaning procedure.
 Knowledge of painting equipment.
 Knowledge of mixing paint.
 Check the temperature before applying paint.
 Knowledge of how to use dial gauge .
 Knowledge of how to maintain thickness of paint 1st layer,2nd layer,3rd layer.
 Use of Thickness gauge to Maintain the thickness of paint for final finish product.
Knowledge of RTR Pipe
• Knowledge in RTR joint Fit up and Assembly.
• Knowledge in RTR heating Activity.
• knowledge in RTR Laying.
• Knowledge in how to storage RTR Piping ,
• knowledge in RTR Hydro test.
• knowledge in RTR Sand bedding and Back filling Activity.
• knowledge in RTR Bolt torquing Activity.
• Knowledge in Fire Hydrant Installation Activity.
• Knowledge of Aramco standard requirement related to Hydrant access distances from road, spacing between Fire hydrant, RTR depth of cover etc.
India Experience
TRIMURTI ENTERPRISES (Engineers & Contractors)
Role: Mechanical Supervisor (Piping / Welding )
Period: 25th July, 2011 to 15th July, 2012
FOUR M CONSULTING ENGINEERS
Role: Mechanical Supervisor ( Piping / Welding )
Period: 10th Aug. 2009 to 10th July 2011.
Professional Certification

• License and certification awarded by American Society of Non-destructive testing:
o ASNT - NDT Level II: Radiography Testing , Ultrasonic Testing , Dye Penetrate Testing and Magnetic Particle Testing.
• Diploma in Computer Application from Indian Institute of Professional Training.

Education Profile
• Diploma in Mechanical Engineering from Al-Kabir Polytechnic college (Board of Technical Education,( Jharkhand ) in 2009.
• 10th –BSEB, Patna in the year 2006.
TECHNICAL / PROFESSIONAL TRAINING & CERTIFICATIONS
Gulf Certificate
• EES Written Practice: EWP204 prepared as per ANSI/ASNT CP-189,2006 Edition.
• Magnetic Particle Test .
• Dye Penetrate Test .
• UT Thickness .
• Certificate Number : (EES-PT-05/2015)
• Diploma in Computer Application from Indian Institute of Professional Training.