We have requirement for the following categories for immediate mobilization.
• *QC Inspector – Piping* _10 Nos_
• Location: Abqaiq
• Duration: ASAP Minimum 6 months
Required Documents for ARAMCO Approval:
• Updated CV
• Copy of CBT Document, ARAMCO Approval & Valid SAP Number
• ARAMCO Vendor Code (Mandatory)