Pre mobilization of PMV requirements: Required documents:
Purchase Order (PO)
Equipment third-party certificate
Insurance
Ownership certificate
Manufacturer manual
Mechanical inspection report
Operator documents:
Operator TPC
Operator KSA Govt license (Heavy Equipment )
Operator medical certificate
Operator GOSI
Ajeer contract
Operator insurance
Note: If the operator is from the supplier, it must also be included in the PO and need to submit undertaking letter