- Posted by BIM Services in USA@bimservices_us
- Contact Email: [email protected]
- Member since: May 2026
- Posted:
- Category: Construction
- Region: Houston (Texas)
- Posting ID: 63374959
How long does MEP coordination actually take, week by week? Eagle BIM published the full 8-week Revit MEP coordination workflow — from design intent to shop-drawing-ready. The weekly rhythm: Monday clash run, Wednesday OAC meeting, Friday trade updates, Sunday prep, then repeat. Model federation, clash detection cycles, resolution tracking, and the fabrication handoff that turns a coordinated model into prefab-ready shop drawings. Read it: https://bim-services.us/blo ...