Delivered measurable improvements in document flow, stakeholder coordination, and approval efficiency by implementing proactive tracking systems and centralized document management practices.
Key achievements include:
• Reduced approval delays by 25% by deploying a structured tracking system at Thabat Construction within the first quarter
• Sustained zero overdue transmittals for 12 consecutive months by applying the same systematic approach at Abunayyan Holding
• Achieved a 98% compliance rate by conducting structured monthly audits of approval workflows and project correspondence
• Reduced document retrieval time by 40% by redesigning and optimizing the centralized Aconex DMS architecture
I hold a BBA degree and am professionally bilingual in English and Arabic. If your project is struggling with slow approvals and document bottlenecks, I bring a proven, scalable solution.
📞 WhatsApp: 0592943784
📧 [email protected]