Substation switch gear panel transformer relay panel MCC function solo run test motor winding test and
LV MV cable test power control panel energization VFD and AFD function test
 strategist cum implementer with recognized proficiency in spearheading operations/business with
Recognized Proficiency in spearheading operations/business with an aim to accomplish corporate plans
 Provide input on safe technical engineering design, costs, plans, and specifications for the construction of new
Facilities and reconditioning or altering existing systems and equipment
 Proven expertise in implementation of planning, construction practices to match the overall schedule
 Monitor equipment/materials delivered to the site and used at work and report the client progress on a regular
 Observe site safety procedures, report violations and hazards.
Equipment Purview
♦ Erection and Commissioning of Electrical Equipments
* Power transformer installation rating (230kva/69kva, 69kva/13.8kva, 13.8kva/4.16kv, 13.8kva/480v), Cable
Sealant, post insulated, surge arrestor, CVTA, disconnect switch, surge counter, AC load bank etc
* High voltage gas insulated substation installation rating (69kva), Switchgear installation (starting rating 13.8kva
To 480v), Protection panel installation for over load, cable leakage, grounding, shock circuit etc
* Motor control circuit installation for control and protect LV field motor and AFD panel installation for control
Speed of air cooler motor, Power system automation panel installation for signal communication purpose
* Battery and UPS panel use for emergency supply in switchgear/MCC control panel, Interposing relay panel use
To signal communication field to PLC/DCS panel
* Lighting Transformer/panel/Junction box installation in field for normal & emergency lights, Field power panel
Installation for heater and welding receptacle for LV power supply, Ladder tray & fittings, perforated tray &
Fittings installation inside substation and field for cable route
* Cable pulling, glanding, termination, cable tag, cable tie, tie mount, lugging, MCT frames, RGS face plate fixed
* Lighting pole, light, lighting Jb, LCS, aircraft warning light, dielectric test, insulation resistance test, contact
Resistance test, function test, turn ratio test, polarity and vector relationship test etc
* Pad lock, loto tag, multi HASP lock, Test plug, Eye wash, shower install in field
♦ Electrical Equipment Test Kit
* CPC 100 Primary injection
* CRM
* TAN DELTA
* HIPOT TEST DC
* VLF HIPOT AC
* MEGGER
* CMC 356
* TESTRNO 600
EDUCATIONAL BACKGROUND
B-Tech-2014 (Electrical & Electronics Engineering) from JAWAHARLAL NEHRU TECHONOLOGICAL