Location: Rumah 2, Dammam Road.
Tank Setup: Above-ground/outside water tanks (Not underground).
Purpose: Water tank leakage testing.
Total Volume Required: Approx. 25,000\m3
Tanker Capacity: Must be 32\m3 (32,000 Liter) capacity trucks.
Daily Frequency: 60 to 70 trips per day required continuously.
Project Duration: To be fully completed within 10 to 14 days.
Given the strict 10–14 day timeline for the leakage testing, we need a supplier who can guarantee a dedicated fleet rotation to maintain the daily trip frequency.
Please reply with your best per-trip rate, water source verification, and your earliest possible mobilization date.
Please provide the best offer.
for more please provide your contact in the comment.
Regards,
[email protected]
Global Engineering Co.