with standards and client requirements.
Ensure all mechanical works are executed according to approved drawings, project specifications and
applicable codes and standards.
Conducted QA/QC inspections for HVAC, plumbing, and firefighting systems across large-scale
residential and industrial projects.
Inspected refrigerant piping as per ANSI and ductwork per SMACNA, and mechanical equipment
installations (AHUs, FCUs, VRF/VRV units, pumps, and cooling towers).
Prepared MIRs, WIRs, NCRs, PQP, ITP, and complete QC documentation
Ensure HVAC, plumbing and firefighting installations are clash free as per drawings, and all the
necessary duct and piping accessories placed correctly
Performed site inspections as per ITPs, method of statements, and project specific QA/QC procedures
Raise NCRs for any non-conforming work and follow up to ensure proper corrective actions and closure
Verified that materials received on site are correct, undamaged and approved for use before installation.
Coordinate with MEP teams, consultants, subcontractors and client representatives to resolve quality
issues and schedule inspections.
Monitor site progress and ensured work completion as per project schedules
Monitor duct installations, air balancing and leakage testing as per standards.
Assisted in the review and coordination of hydrostatic testing activities for chilled water, domestic
water, and firefighting piping systems in accordance with project specifications and approved
procedures.
Participated in the inspection and verification of pressure testing, flushing, and testing records to ensure
compliance with QA/QC requirements.
Supervised the installation of chilled water piping, ducting, insulation, and equipment installations
Inspected piping and ductwork supports, hangers sleeves and penetrations to verify compliance with
approved drawings, specifications, and installation standards.
Monitored duct installation quality and reviewed duct smoke leakage test reports to verify compliance
with project specification and applicable standards.
Ensure all inspection tools and test equipment were calibrated and used according to project
requirements.