Site Electrical Engineer, 8+ Yrs Exp , Transferable ID, Immediately Join

ANWAR MUSTAFA SYED
Electrical Project Engineer MEP

â?  +966-53 802 2106 â?? [email protected] Saudi Arabia



PROFESSIONAL SUMMARY
Experienced Electrical Project Engineer with over 12 years of expertise in electrical
construction, MEP systems, testing & commissioning, and infrastructure projects across
Saudi Arabia and India. Specialized in LV/MV systems, healthcare facilities, commercial
buildings, power distribution, fire alarm systems, transformer installation, cable termination,
and low current systems. Strong background in project execution, site supervision, testing
activities, and coordination with consultants, subcontractors, and clients while ensuring
compliance with Saudi and international standards.

CORE COMPETENCIES
ï?· Electrical Project Management & Site Execution
ï?· Testing & Commissioning of LV/MV Systems
ï?· MEP Construction & Infrastructure Projects
ï?· Transformer & MDB/SMDB Installation
ï?· Fire Alarm, BMS & Low Current Systems
ï?· Cable Tray & Cable Termination Works
ï?· Electrical Load Calculations & SLD Preparation
ï?· Earthing & Lightning Protection
ï?· AutoCAD 2D & Electrical Documentation
ï?· Client & Consultant Coordination

PROFESSIONAL EXPERIENCE
Electrical Project Engineer Probuilder Contracting Company â?? Jeddah, Saudi Arabia
(2023 â?? 2024)
Project: Logistics & Cargo Warehouse â?? Jeddah International Airport (GACA)

ï?· Supervised and executed electrical installation works for lighting, power distribution, IP
telephone/data systems, public address systems, access control systems, and fire alarm
systems.
ï?· Managed installation, testing, and commissioning of transformers, MDBs, SMDBs, cable tray
systems, and LV cable terminations in accordance with approved drawings and project
specifications.
ï?· Coordinated first fix, second fix, and final fix activities while ensuring smooth interface with
civil, HVAC, and MEP teams.
ï?· Monitored site progress, manpower, and material requirements to ensure completion of work
within the approved project schedule.
Page 1 of 4
ï?· Coordinated with consultants, subcontractors, and client representatives for inspections,
approvals, and successful execution of electrical works.
ï?· Reviewed electrical drawings, method statements, and as-built drawings to ensure compliance
with project quality standards, safety regulations, and Saudi construction requirements.

Electrical Project Engineer Tawabeq Al Emaar Health Care Contracting Co. â?? Saudi
Arabia (2019 â?? 2023)
Project: King Fahad Armed Forces Hospital Jeddah, Masharif Hospital, KACST Riyadh,
Malieen Hospital Riyadh.
ï?· Executed healthcare electrical works for ICUs, operation rooms, CT scan rooms,
patient rooms, and specialized medical departments.
ï?· Managed installation of nurse call systems, BMS, public address systems, fire alarm
systems, and power distribution systems.
ï?· Conducted insulation resistance testing, Hi-Pot testing, relay testing, loop checking, and
functional testing.
ï?· Coordinated energization and commissioning activities for LV/MV systems and electrical
equipment.
ï?· Prepared commissioning reports, punch list documentation, and as-built drawings.

Electro-Mechanical Project Engineer Basic Construction Co. Riyadh, Saudi Arabia.
(2016 â?? 2019)
Project: Office & Accomodation Project â?? Saudi Royal Fifth Air Defence Jubail, Saudi Arabia.
ï?· Managed installation of electrical systems, fire detection systems, irrigation systems,
drainage systems, and water supply systems.
ï?· Supervised installation of transformers, MV/LV panels, MDBs, cable trays, and cable
terminations.
ï?· Installation of 2MVA step down transformer to 13.8 KV MV line and RMU with 15KV,
cable armoured 95mm2.
ï?· Megger test. Phase sequence test performed at site.
ï?· Coordinated testing & commissioning activities and maintained progress reports.
ï?· Ensured work execution according to approved drawings, specifications, and safety
standards.

Site Engineer Basic Construction Company â?? Riyadh, Saudi Arabia (2014 â?? 2016)
Project: Commercial Building Project & King Abdullah Cultural Center Project
ï?· Supervised installation of lighting, power, communication systems, low current systems, and
fire alarm systems.
ï?· Assisted in transformer installation, bus riser installation, and testing & commissioning
activities.
ï?· 1.5MVA, 2MVA step down 13.8/0.4KV Transformers installed,
ï?· Megger Test, Phase sequence and other essentials
ï?· Coordinated testing & commissioning activities and maintained progress reports.
ï?· Prepared RFIs, inspection reports, and project documentation while coordinating with
consultants.

Site Engineer Venkateshwara Electricals â?? Hyderabad, India (2011 â?? 2013)
Project: Ramky Towers â?? 12 Floor Apartment Complex

Page 2 of 4
ï?· Executed electrical installation works for residential high-rise projects including lighting,
power, communication systems, and fire alarm systems.
ï?· Assisted in transformer installation, testing & commissioning, and project
coordination activities.



TESTING & COMMISSIONING EXPERIENCE
ï?· Executed pre-commissioning and commissioning activities for LV/MV electrical systems.
ï?· Performed switchgear, MCC, DB, and protection relay testing and calibration.
ï?· Conducted Transformer Testing, Phase Sequence, Generator NL & FL test, Earth Resistance Test
ï?· Conducted earthing and lightning protection system testing.
ï?· Performed loop checking, signal testing, and point-to-pont wiring verification.
ï?· Coordinated system energization activities and client inspections.
ï?· Prepared test reports, commissioning dossiers, and punch list clearance documentation.

RESPONSIBILITIES & PROJECT COORDINATION
ï?· Coordinated with consultants, subcontractors, and client representatives for project
execution.
ï?· Prepared RFIs, MIRs, engineering change requests, BOQs, and progress reports.
ï?· Reviewed electrical drawings, structural drawings, and as-built documentation.
ï?· Supervised installation, assembly, and inspection of electrical systems and equipment.
ï?· Maintained project schedules and monitored daily/weekly site progress.
ï?· Conducted safety inspections and ensured compliance with project standards.
ï?· Managed procurement of electrical materials and maintained delivery documentation.
ï?· Participated in project review meetings and technical coordination discussions.

TECHNICAL SKILLS
ï?· AutoCAD 2D
ï?· Microsoft Office & Excel
ï?· Electrical Load Calculations
ï?· Single Line Diagram (SLD) Preparation
ï?· Electrical Design & Site Do
Back Next