f
DUTIES
Installation of FTTH Optical Fiber / Copper installation in accordance with STC
recommendations and standards
EMT installation, UTP Fiber, Installation Public Address system.
Fiber Optics cable Splicing and Testing.
Fluke Network Cable Testing.
Installation of CCTV Camera.
Certified to work in:
•Inside the Tunnel
•Viaduct
• Cut and cover
• At Grade
•Trackside, Platform etc.
Installation of 1st Fix (Grounding Network, Cable Tray, False Floor, Cubicles Support
etc.) in Signaling Equipment Rooms - SER/SMR/CER Follow Site Safety Rules.
Installation, termination & testing-commissioning of following trackside equipment.
•Verbalize Beacons.
• Axle counters – (Gak box, Wheel sensor)
•Point machines Mainline and Depot (MJ2004 & MATR68).
• Buffer Stop/Shunting signals. (Mast & Wall bracket Configuration) DCS
(Antennas, TRE Box, Loop Box, etc.) BLS/SPKS Equipment.
Installation of mock-up for Gak-boxes, power DB, & SVM boxes.
Compliance for Safety Requirements in Stations, Platforms, Trackside and other site
locations.
Installation of 2nd Fix (Power Distribution Panel PDC, Smart I/O, ODF, CTN/BTN, Relay
Frames, Cable Frames, Media Cubicles and other Panels with Cable
Lay/Termination/Testing) in Signaling Equipment Rooms - SER/SMR/CER
Installation of Grounding Mesh Network under False Floor. MOHAMMAD SHAHBAZ
(IT Technician)
laying and termination for Signaling, Power & Grounding cables. i.e., 3G 6mm2, 3G
2.5mm2, 3G 4mm2, 4-Qaud, 7-Quad, K-23 (2p, 4p 6p, 8p, 14p, 28p, 48 Pairs)
Cu/XL
Trở lại Tiếp theo