A dedicated "Lifting Supervisor" with over 5+ years of proven experience in lifting and rigging operations across petrochemical, pipeline, and construction projects. Strong commitment to safety compliance, environmental standards, and strong English communication skil,

With Immediate mobilization.



--- CV ---
KAMRAN KHAN
Contact: +966 56 767 8545
Address: Al Jubail, Est. Dammam 35514
Iqama: Transferable
Email: [email protected]
[email protected]




Career Objective:
I am a Mechanical Engineer, working as Lifying Supervisor with 4 years of
experience, seeking the role of Lifting Supervisor, where I would be given an opportunity
to utilize my theoretical skills, sense of responsibility and efficiency to help the
organization grow.




Education:
Bachelor of Science in Mechanical Engineering
Institute: University of Engineering and Technology, Peshawar
Session: 2018 – 2022

Higher Secondary School Certificate
Institute: Peshawar Cambridge Degree College, Peshawar
2015 – 2018




Experience:
Experience:

QDC – ABR Construction (AL AROUS Project)
Consultant: AJi Saudi
Duration: June 2024 - Present
Designation: Lifting Supervisor


Anabeeb
Duration: 1st Dec 2023 – 31st May 2024
Designation: Lifting Supervisor




Page 1 9
Petrokemya (North) – (Shutdown) – Sabic
Project: Sabic Turnaround – EBS II

Petrokemya (South) – (Shutdown) - Sabic
Project: Sabic Turnaround – Olefin 2

Yanpet – Anabeeb (Shutdown) - Sabic
Project: EG-II T/A 2024


Petrokemya (North) – WISON Engineering (Shutdown) - Sabic
Project: Capture & Utilise Vent Gas for EBS-I (E&PM)
Duration: 6th Oct 2023 – 16th Nov 2023
Designation: Lifting Supervisor


QDC – Samsung C&T Corporation (APOC Project)
Duration: July 2023 – Sep 2023
Designation: Lifting Supervisor


DESCON Engineering Limited (Pakistan)
Duration: July 2022 – June 2023
Designation: Rigger I

ï‚· Supervise all lifting operations on the construction site and in oil and gas power
plants, ensuring activities are carried out safely and efficiently.
ï‚· Ensure that both rigger and operator are familiar with the signaling tube used.
ï‚· Monitoring wind speed and its direction.
ï‚· No load is lifted without any lifting plan.
ï‚· All the lifting equipment and lifting gear are checked and verified before lifting any
load and have their valid third party.
ï‚· Review and implement approved lifting plans in accordance with project
requirements.
ï‚· Conduct pre-lift inspections of cranes, lifting equipment, slings, shackles, and
rigging gear.
ï‚· Ensured all the safety devices for the cranes are in working conditions.
ï‚· Ensure all lifting equipment is certified and in good working condition before use.
ï‚· Coordinate with crane operators, riggers, and site management for smooth
operation.
ï‚· Lead pre-lift meetings, toolbox talks, and safety briefings with lifting teams.
ï‚· Monitor site conditions for potential hazards affecting lifting operations, such as
weather, ground stability, or site congestion.
ï‚· Enforce compliance with lifting regulations and site-specific safety policies.
ï‚· Stop unsafe operations and implement corrective actions where necessary.
ï‚· Maintain accurate records of lifting operations, equipment inspections, and
personnel certifications.
ï‚· Report incidents, near misses, and non-conformities promptly to site management.



Page 2 9
Certificates
 NEBOSH – IGC Occupational Health and Safety

Software Skills:
ï‚· AutoCAD
ï‚· SolidWorks
ï‚· MS Office

Personal Skills:
ï‚· Problem Solving Skills ï‚· Safely Managing
ï‚· Analytical Skills ï‚· Communication Skills
ï‚· Team Work ï‚· Time Management


Languages:
ï‚· English (Medium Advance)
ï‚· Arabic (Medium)
返回 下一个