Pipe racks with correct anchor, guide, and sliding support details. Equipment support structures for static and rotating loads. Platforms, walkways, stairs, ladders, and grating packages. Built-up girders and plate work alongside rolled sections.
Shop splices located for road transport, faying surfaces handled correctly on slip-critical bolted connections, and erection marking that matches the drawings so the site team isn't sorting steel on the ground.