The figures must not be described as 2,800 MW of load shedding. Separate packages are simultaneous only if outage windows overlap. Reduced ATC and TTC mean less import headroom while elements are unavailable. They do not establish that system lacked supply or consumers were curtailed.
Indian Power news should track execution conditions. Ishanagar was scheduled for 7-9 September, subject to Western Region approval and Northern demand. Fatehpur-Sasaram was approved within September, with weekend operation, a two-day limit and staggered execution. EnergylineIndia.com provides the assessment. The Inter State Transmission System must avoid stacking capability-affecting shutdowns. The Inter State Transmission System faces market and reliability costs from reduced headroom. Successful maintenance and restoration of the Inter State Transmission System transfer envelope remain the outcomes.