Electrical Distribution Project /LV/MV Installation Termination Jointing Testing

services Offered: Low Voltage (LV) & Medium Voltage (MV) Cable Works Executing complete turn-key solutions for utility, industrial, and commercial electrical distribution projects in strict compliance with utility standards (such as SEC/IEC/IEEE guidelines). Core Scope of Services/MV Cable Installation: Trench preparation, sand bedding, direct burial, and cable pulling through ducts, trays, and ladders using tension-monitored equipment. Cable Jointing (Splicing): Straight-through and branch jointing using approved Heat-Shrink, Cold-Shrink, or Pre-Molded joint kits. Includes precision semiconductor layer stripping, stress-cone installation, and mechanical shear-bolt/crimp connections. Cable Termination: Indoor, outdoor, and dead-front elbow terminations for Ring Main Units (RMUs), transformers, switchgear, and distribution feeder pillars. Testing & Pre-Commissioning:Insulation Resistance (Megger Testing) for LV (1 kV DC) and MV (2.5/5 kV DC). Phase Continuity & Verification. Outer Sheath DC Integrity Testing. Very Low Frequency (VLF) AC High-Voltage Withstand Testing (0.1 Hz) for MV XLPE cables.
Trở lại Tiếp theo