Objective:
Dedicated and results-driven Electrical QC Inspector with strong experience in the
inspection, testing, and quality assurance of electrical systems. Skilled in ensuring compliance
with project specifications, international standards, and safety regulations, I have contributed
to industrial and commercial projects by monitoring installations, verifying materials, and
conducting inspections at various stages of execution. With a keen eye for detail and a
commitment to maintaining the highest quality standards, I bring expertise in troubleshooting,
documentation, and system optimization. I am eager to apply my inspection skills and
technical knowledge in a challenging environment, ensuring excellence and continuous
improvement in electrical works.

Education: Diploma of Electrical Associate Engineer-PAK

Certification: QMS ISO-9001:2015 Lead Auditor by CQI-IRCA
Work Experience:

1 Project : Amiral Petrochemical Complex
Company : Nasser S. Al Hajri Corporation (NSH)
Position : Electrical QC Inspector
Duration : May 2026 â?? Present

2 Project : Magna Water Storage Reservoir-Neom
Company : Al-Rawaf Contracting
Position : Electrical QC Inspector (Neom Approved)
Duration : Nov 2023 â?? Apr 2026

3 Project : Break Pressure Tank and Water Transmission Pipeline-Neom
Company : Anfa Engineering
Position : Electrical QC Inspector
Duration : Aug 2022 â?? Oct 2023
4 Project : Station AC-6-Multan
Company : Sui Northern Gas Pipeline-LTD- PAK
Position : Electrical QC Inspector
Duration : Apr 2021 â?? June2022


5 Project : 133KVA Substation-Islamabad
Company : IESCO-PAK
Position : Trainee Engineer (Electrical)
Duration : Sep2020 â?? Feb2021


Duties and Responsibilities â?? Amiral Project-NSH (QC Inspector)
â?¢ Performed inspection and verification of Duct Bank Fabrication, Underground Direct-
Buried PVC conduits ensuring compliance with approved drawings, project
specifications, conduit separation requirements, and installation standards.
â?¢ Conducted quality inspections of Grounding Systems, including PVC Grounding
Conductors, Bare Copper Grounding Grids, Grounding Electrode, Thermite Welding
and Grounding Busbars within substations, buildings, and process facilities, verifying
continuity, bonding, routing, and compliance with design requirements.
â?¢ Executed Material Receiving Inspections (MRI) for electrical materials including PVC
Conduits and Fittings, Cable Trays, Junction Boxes, Metallic Conduits, Lighting
Fixtures, LV Power Cables, and accessories, ensuring conformity with approved
submittals, purchase orders, and project specifications.
â?¢ Inspected the installation of Cable Tray Systems within Substations, Cable Cellars,
Process Areas, and Pipe Racks, verifying support spacing, tray alignment, tray bonding,
segregation requirements, and compliance of NEMA VE II, Approved construction
drawings and applicable standards.
â?¢ Witnessed and inspected the installation, alignment, preservation, and pre-
commissioning activities of 34.5 kV Power Transformers, including inspection of MV
cable terminations, stress cones, Cable Glands, Grounding Connections, and associated
testing activities.
â?¢ Inspected the installation of lighting systems in process areas, substations, pipe racks,
buildings, and outdoor facilities, ensuring the correct selection and installation of
fixtures in accordance with hazardous area classification, environmental conditions,
area classification drawings, and project specifications.
â?¢ Verified preservation requirements for LV and MV motors, transformers, and electrical
equipment by monitoring insulation resistance testing, space heater operation, storage
conditions, environmental protection measures, and preservation records in warehouses
and field locations.
â?¢ Issued Inspection Non-Conformance Reports (INCRs), Site Surveillance Reports, and
Proactive Notifications for deficiencies and ongoing activities related to cable tray
installation, grounding systems, cable pulling, cable laying, glanding, and termination
works, ensuring timely corrective actions and quality compliance.
Duties and Responsibilities - Magna Water Storage Reservoir (QC
Inspector)
â?¢ Performed stage-wise inspections of electrical works in compliance with IFC drawings,
approved method statements, ITPs, and project specifications.
â?¢ Inspected installation and testing of LV/MV power, control, instrumentation, and fiber
optic cables including routing, glanding, termination, tagging, and identification.
â?¢ Verified installation of electrical systems including power distribution (MDB, SMDB,
DB), RMU, UPS, PLC/SCADA panels, and associated equipment.
â?¢ Conducted inspections of cable containment systems (cable trays, conduits, supports)
ensuring proper installation, alignment, and grounding compliance.
â?¢ Reviewed and approved material submittals (MIR) and ensured all installations
complied with approved materials and vendor specifications.
â?¢ Inspected earthing and bonding systems including grounding networks, continuity, and
resistance testing as per standards.
â?¢ Carried out inspections for cathodic protection systems, including anode installation,
cable laying, and pin brazing works as per project requirements.
â?¢ Verified installation and integration of fire alarm and suppression systems, including
FACP, repeater panels, smoke/heat detectors, modules (MCC, FMM), and NOVEC
system first-fix and termination.
â?¢ Inspected instrumentation systems including level transmitters (LIT), level gauges, level
switches, hatch door sensors, and associated control wiring.
â?¢ Conducted quality inspections for solar power systems, including PV panels, inverters,
AC combiner panels, transformers, and associated LV connections.
â?¢ Verified installation and termination of communication and control cables including
CAT6, Profibus, and instrumentation cables for BMS and SCADA systems.
â?¢ Inspected BMS/DDC panels, MCC, HPU systems, and traffic signal systems ensuring
proper installation and functional compliance.
â?¢ Witnessed and supported testing & commissioning activities including SAT for RMU,
MDB, SMDB, LV panels, UPS, and solar systems.
â?¢ Ensured coordination with mechanical, civil, and instrumentation teams to avoid
interface issues and maintain smooth project execution.
â?¢ Raised NCRs for non-conformances and ensured timely implementation of corrective
and preventi