To secure a position as INSTRUMENTATION QC INSPECTOR with a reputable company where I can utilize my knowledge and experience in instrumentation engineering for professional growth while contributing towards organizational goals
PROFESSIONAL SUMMARY
Meticulous and focused individual with B-Tech in E&I Offering more than 7 years of experience in Oil& Gas and Petrochemical Industry.
JOB RESPONSIBILITIES
Review of Method Statement submitted by Contractor and Sub-contractors.
Review of RFI documentation submitted by Contractor and Sub-contractors.
Conduct surveillance and unannounced visits to construction sites.
Issuance of Proactive Notifications, General Comments, Focused Assessment and Logbook Entry (LBE).
Responsible for punch lists comments during PMCC.
Implementing standards and procedures.
Review of related documents such as IFC drawings, certificates, specifications, and procedures.
Verification of IFC drawings such as ISS, ILD, P&ID, Hook-up Drawing, Cable Schedule, and Termination Schedule.
Actively conducting internal inspections at construction site based on RFI submitted by the construction.
Constantly conducting surveillance inspections at construction sites.
Maintaining and controlling the flow of works and procedures as per ITP (Inspection and Test Plan).
Checking the works as per standard, procedures, and project specifications.
Responsible for defining and documenting inspection activities.
Responsible for issuing Non-Conformance Reports (NCR) to those activities who violate the standards, procedures, and non-compliance of the quality requirements.
Checks the validity of test equipments to be used during calibration, cable testing and leak testing.
Responsible for preparation and monitoring of Loop Folders.
Conduct material receiving inspections and review of material’s supporting documents for instrumentation scope of materials prior for site acceptance.
Witness instrument calibration activities for both in-house and field calibration.
Preparation of calibration reports or certificates of calibrated transmitters, control valves, MOV, gauges, temperature elements, etc.
Inspection of instrument support / stanchion installation as per P&ID, IPL, and Hook-up.
Inspection of cable raceways such as conduits, cable trays, cable trenches and duct-banks prior pulling.
Witness cable laying and cable pulling activities.
Witness cable glanding, cable dressing and termination as per interconnection diagram.
Witness cable continuity and insulation resistance testing.
Preparation of test results after cable testing (continuity and IR test)
Inspection of instrument airline and impulse tubing installation as per P&ID and Hook-up drawing.
Witness instrument airline and impulse tubing leak testing.
Preparation of test reports for leak testing of impulse tubing and instrument airline.
Witness valve stroking and calibration for control valves, MOV, on-off valves etc.
Witness third party valve testing, popping test and calibration of PZV (Pressure Safety Valves).
Inspection of control valve installation for correct orientation and accessibility.
Final checking and verification of instrument installation according to all related IFC drawings such as IPL, P&ID, ILD, Hook-up drawing, ISS and Termination drawing for completeness and readiness of Loop prior for loop checking.
Witness final loop checking activities for completed loops from CCR/PIB/Console to field instruments during pre-commissioning works.
Preparation of Loop Check records and test results.
Issuing and monitoring of Loop Test punch lists being generated during final loop checking
Aromal Dev
[email protected]
+966 539476388