I'm Mechanical And BMS Engineer Looking For A New Job

BMS Site Engineer / BMS Team Coordinator, CBD Project
Led the BMS team and coordinated requirements between the low-current team and other disciplines (mechanical,
architectural, low-voltage).
• Conducted troubleshooting, testing, and commissioning for LCPs, standalone and communicated FCUs, SPF and EPF
panels, and CPCVS.
• Prepared and reviewed BMS shop drawings and managed site execution across contractors, supplier, and
consultants.
• Coordinated the interface between BMS and other building systems by project specifications.
• Reported to consultant engineers on shop drawing schedules, document submittals, mock-up inspections, and site
visits.
• Reviewed and submitted BMS technical documentation including MAT, SCR, MIR, MST, and TOD.
• Provided design specifications, bills of quantities (BOQ), and cost estimates for BMS components.
• Attended coordination meetings with clients, consultants, and suppliers, and conducted regular site quality
inspections.

MEP Site & Technical Office Engineer
• Designed shop drawings for firefighting and HVAC systems.
• Supervised installation of HVAC and plumbing systems for Tiba Rose Hotel.
• Managed testing, inspection, and commissioning activities with consultant engineers.
• Prepared site document submittals including RFI, MIR, TOD, MST, and SCR.
• Coordinated with suppliers and subcontractors to support project execution.
• Performed quantity surveying for installed pipes and ducts to process sub-contractor payment certificates.

BMS Site Engineer
• Designed, reviewed, and modified shop drawings for BMS installations.
• Inspected first-fix installations for BMS field components and field networks.
• Supervised execution and integration of BACnet, Modbus, and M-Bus communication protocols.
• Executed device installation for Air Handling Units (AHU) and Energy Transfer Stations (ETS), VAV unit, FCU units,
CPCVS, per engineering specifications.
• Performed panel termination for Local Control Panels (LCP) and Conducted Testing and commissioning for panel to
final startup and time schedules.
• Conducted testing and commissioning for LCP panels and tested DDC software functionality per project sequence of
operation.
Back Next