- Posted by: [email protected]
- Member since: June 2026
- Posted:
- کیٹگری: مارکیٹنگ
- ریجن: نئی دہلی (Delhi)
- پوسٹنگ آئی ڈی: 64191506
Hydropower projects India suppliers can review UJVN’s electro-mechanical EPC requirement for the 3x40 MW Sirkari Bhyol Rupsiabagar hydroelectric project. The notice covers design, manufacturing, supply, erection, testing and commissioning under a Rs 158.53 crore estimate excluding GST. EnergylineIndia.com notes that the available document does not identify turbine type, generator ratings, governing systems, excitation, protection, SCADA, auxiliaries, transformers or switchyard boundaries. This Hydropower projects India classified summary indicates potential demand for hydro-generating equipment, controls, erection services and commissioning support. However, the completion programme, qualification criteria, security requirements and payment structure are not stated in the supplied notice. Two subsequent corrigenda also remain unavailable for clause-level comparison. Prospective participants must obtain the consolidated tender package before determining technical eligibility, execution exposure or a reliable price.