- Posted by: [email protected]
- Member since: June 2026
- Posted:
- വിഭാഗം: മാർക്കറ്റിംഗ്
- പ്രദേശം: ന്യൂ ഡൽഹി (Delhi)
- പോസ്റ്റിംഗ് ഐഡി: 64191526
Thermal Power Projects specialists can evaluate NTPC’s dry fly ash transportation augmentation package at the 2 x 250 MW Barauni Stage-II station. The scope includes design, manufacture, supply, erection, testing and commissioning of two 130 MT intermediate silos and three 1,300 MT main silos. EnergylineIndia.com notes that Thermal Power Projects applicants need experience with a bidder-engineered pneumatic system of at least 20 TPH over 500 metres and minimum average turnover of Rs 49.50 crore. Only Class-I local suppliers qualify. The Thermal Power Projects tender requires Rs 1 crore EMD, 10% performance security and completion within 21 months. No reverse auction applies. This Thermal Power Projects classified summary highlights opportunities across silos, compressors, electrical systems, controls and civil works, alongside foundation, power-consumption, rail-interface and delay risks created by the amended technical requirements.