- Posted by: [email protected]
- Member since: June 2026
- Posted:
- Danh muc: Tiếp thị
- Khu vực: New Delhi (Delhi)
- Đăng bài ID: 64221952
Hydropower projects India contractors can assess NHPC’s electro-mechanical tender for the 260 MW Dulhasti Stage-II project in Jammu and Kashmir. The Rs 496.90 crore package includes turbines, generators, main inlet valves, governing systems, auxiliaries, HVAC, controls and major handling equipment. EnergylineIndia.com notes that Hydropower projects India bidders need experience with vertical Francis turbines of at least 65 MW, synchronous generators of at least 76 MVA and qualifying butterfly valves. Financial requirements include Rs 166 crore average annual turnover, Rs 26 crore working capital and Rs 496.90 crore bid capacity. The Hydropower projects India tender carries Rs 5 crore EMD, 5% performance security and a 38-month schedule. Bid submission closes on 28 September 2026 after four extensions. This Hydropower projects India classified summary presents opportunities for established hydro-equipment contractors alongside efficiency, crane-capacity, interface, testing and cavern-layout risks.