EOT & Construction Claims Consultancy

 EOT & Construction Claims Consultancy – Saudi Arabia:

I'm Shaik Faiazuddin, CEO of Expert Contracts. I bring over 35 years of international experience gained across Saudi Aramco, Bechtel, SABIC, Qatar Petroleum, and other major global EPC organizations, and I've built Expert Contracts around one core capability: Extension of Time (EOT) and construction claims done properly, from the ground up. We operate with a dedicated office and a full in-house team, so every claim is handled by qualified professionals, not outsourced or passed around.

Most contractors don't lose claims because they weren't entitled — they lose because the claim was never built well enough to survive scrutiny. Weak time impact analysis, missing contemporaneous records, entitlement arguments that don't tie back to the contract, or submissions that read like a narrative instead of a case. That's the gap we close.

We are currently engaged in processing EOT and claims for 4–5 contractors on live Saudi Aramco projects, which keeps us directly exposed to the standard of evidence, analysis, and formality that Aramco and similar owners expect from a submission before they'll even engage with it seriously.

 Where we support contractors:

• Extension of Time (EOT) claims – from initial notice through full-time impact analysis, delay narrative, and final substantiated submission.
• Delay and disruption claims – critical path analysis, concurrent delay assessment, and disruption quantification.
• Variation claims – scope change identification, valuation, and formal submission.
• Quantum and cost claims – linking time-related costs and loss to a defensible, auditable basis.
• Claim review and strengthening – if you've already submitted and it's stalled, weak, or been rejected, we review it, identify the gaps, and rebuild it.
• Rebuttal support – responding to an owner's or consultant's rejection with a properly reasoned counter-position.
• Negotiation support – carrying the claim through to settlement, not just handing over a document.

 How we work:

We start by reviewing your contract, the programme, and your site records to understand exactly what's provable and what isn't — no claim goes out that we can't stand behind. From there we build the time impact analysis, tie it to the specific clauses that support entitlement, and put together a submission structured the way an owner's claims team actually reviews it, not the way a generic template assumes they will.

We work with contractors and subcontractors across all regions of the Kingdom, on projects of varying scale, and we're comfortable stepping into a claim mid-way if it's already in trouble.

If your EOT submission is overdue, stuck with the owner, weaker than it should be, or you simply want it built right the first time, reach out and we'll walk through it.

 Expert Contracts:
📧 [email protected]
📱 +966 53 594 6638
🌐 https://expertcontracts.ca/
CR: 7053779828

Riyadh, Job Seekers, EOT & Construction Claims Consultancy Riyadh, Job Seekers, EOT & Construction Claims Consultancy