QA/QC Civil Engineer with 8 years of experience, currently associated with major Saudi giga-projects, including Qiddiya Motor Sport Hotel Complex and King Salman Park (KSP).
ISO 9001:2015 IRCA-certified, with expertise in Civil, Structural and Architectural quality control across high-rise buildings, infrastructure, housing and PEB Steel structures.
Strong knowledge of documents submittals, ITPs, Method Statements, Inspection Checklists and Quality Management Systems.
Experienced in WIR/MIR inspections, material approvals, NCR management, RCA, CAPA, audits and project handover.
Proficient in ASTM, ACI, BS, EN, SBC and ISO standards, ensuring compliance with project specifications and client requirements.
Registered with the Saudi Council of Engineers, Qatar Council of Engineers and Pakistan Engineering Council.
Seeking challenging QA/QC Engineer opportunities in Saudi Arabia and the GCC.

--- CV ---
TARIQ AZIZ
QA/QC ENGINEER — CIVIL (STRUCTURAL & ARCHITECTURAL)
Riyadh, Saudi Arabia +966 53 986 5580 [email protected] Transferable Iqama Valid KSA License

PROFESSIONAL SUMMARY

ISO 9001:2015 IRCA-certified QA/QC Civil/Stru/Arch Engineer with 8 years’ experience across major projects in KSA and Qatar. Track
record: sustained 95%+ NCR closure rates, 100% compliance on 90,000+ sqm of structural concrete, and direct supervision of QC teams on
giga-projects including King Salman Park. Registered with the Saudi Council of Engineers and Qatar Council of Engineers.


- 100% standards compliance (ASTM/ACI/BS/SBC/ISO) verified across 90,000+ sqm of structural concrete on the King Salman Park giga-
project
- 97–99% NCR closure rate sustained across 40+ logged NCRs across five projects
- 96% first-time inspection pass rate across 65 site inspections on an 8,500 sqm steel structure scope
- 1,020+ WIRs/MIRs processed with 96%+ on-time consultant closure across career

PROFESSIONAL EXPERIENCE

QA/QC Engineer Civil/Stru/Arch — Qiddiya Motor Sports Hotel Complex
- Review contract documents, project specifications, IFC/shop drawings, approved material submittals and client requirements to establish
project-specific quality, inspection, testing and material acceptance criteria.
- Prepare Codes of Practice and quality acceptance criteria by integrating applicable Saudi Building Code (SBC), Saudi laws/regulations and
international standards including ASTM, ACI, BS, EN and ISO, ensuring compliance with project and statutory requirements.
- Develop, review, and maintain Inspection and Test Plans (ITPs), Method Statements (MS), and Inspection Checklists in compliance with
project specifications, contractual obligations, client/consultant requirements, and ISO 9001 quality management principles.
- Coordinate with contractors, subcontractors and site teams to resolve non-conformities, applying RCA and CAPA through to closure.
- Monitor supplier performance and material quality through pre-qualification, MAR/MIR reviews, MTC and test report verification,
inspections and audits.
- Prepare quality reports, maintain inspection and NCR records, and support project audits to confirm works meet project and safety
requirements.

QA/QC Engineer Civil/Stru/Arch — CITIC Middle East Contracting Company
Riyadh, Saudi Arabia May 2024- May 2026
Project 1: King Salman Park (KSP) Giga-Project Structural & Architectural Works Current assignment January 2026– May 2026
- Develop and maintain ITPs, Method Statements and Inspection Checklists in accordance with contract requirements, client/consultant
specifications, project requirements and ISO 9001 principles.
- Develop and review ITPs, WIR/MIR inspection procedures and checklists, defining inspection stages, Hold/Witness Points, responsibilities,
sampling/testing requirements, acceptance criteria and required quality records.
- Prepare and review Method Statements and Material Approval/MAR-MIR documentation, including technical data sheets, MTCs,
certificates, test reports and manufacturer requirements, ensuring materials and construction methods comply with approved drawings,
specifications and applicable codes.
- Conduct site inspections and witness quality tests, maintaining accurate WIRs, MIRs, checklists and QA/QC records
Manage and maintain QA/QC documentation and quality systems, including NCR, RCA, CAPA, audit records, quality registers and
inspection records; coordinate with engineering, construction, procurement, subcontractors, consultants and clients to ensure traceability,
compliance, corrective-action closeout and project quality requirements
Project 2: Security Forces Medical Center (SFMC) Prior assignment \ May 2024-December 2025
- Prepared and confirmed checklists for materials and work procedures across switchgear substations A and B and a 700-linear-meter tunnel
scope
- Briefed 8 supervisors and site teams on quality requirements per project specifications prior to activity start
- Verified work execution against approved ITPs across structural and architectural works
- Initiated and managed 150+ WIRs and 75+ MIRs, coordinating consultants and clients on the project
- Led snagging/de-snagging inspections across finished works, closing out 95% of defects within the Defects Liability Period
- Logged and tracked 10+ NCRs across structural and architectural works, achieving 98% closure within target timelines
QC Engineer Civil/Stru/Arch— Azmeel Contracting Co.
Dhahran Al Junoob, Saudi Arabia Dec 2022 – Apr 2024
Southern Border Housing Project, Site S03 230 Housing Units / 57,584 sqm
- Verified 57,584 sqm of structural and architectural execution against approved ITPs across 230 housing units
- Processed 500 WIRs and 125 MIRs, coordinating consultant and client sign-off across the full site scope
- Closed 99% of 15+ NCRs applying CAPA procedures within target timelines across structural and architectural works
- Closed out 95% of defects within the DLP across 34,570 sqm of finished works through snagging/de-snagging inspections
- Directed 5 contractor work programs and maintained drawing registers and weekly diaries; briefed 5 supervisors on quality requirements prior
to activity start
QC Engineer Civil/Stru/Arch —Generic Engineering Technology
Qatar Aug 2021 – Sep 2022
Panda Enclosure & Touristic Viewing Facility – Al Khor, Qatar
- Submit RFIs covering all civil executed work, achieving a 98% on-time consultant response/closure rate
- Verified mill certs, MTRs and member dimensions pre-erection; controlled plumb/alignment at each lift and cleared bolt torque, welds and
NDT before stage WIR sign-off.
- Raised and closed NCRs for out-of-tolerance members or rejected welds, maintaining the full erection QC record set.
- Led fit-out QA/QC across flooring, finishes, ceilings, partitions, glazing, stonework, joinery, doors and theming/rock-art works, verif
Umluj, Job Seekers, Qa Qc Engineer Civil Umluj, Job Seekers, Qa Qc Engineer Civil Umluj, Job Seekers, Qa Qc Engineer Civil Umluj, Job Seekers, Qa Qc Engineer Civil Umluj, Job Seekers, Qa Qc Engineer Civil Umluj, Job Seekers, Qa Qc Engineer Civil Umluj, Job Seekers, Qa Qc Engineer Civil Umluj, Job Seekers, Qa Qc Engineer Civil
Quay lại Tiếp theo