SYED MUHAMMAD SHOAIB
Email id â [email protected]
Contact : 0507922647
Iqama: 2567348889
OBJECTIVE:
Iâve Worked as a Mechanical Rotating QC Inspector in oil & gas, petrochemical, and industrial projects,
utilizing strong experience in inspection, installation, alignment, and commissioning of rotating
equipment.
Experienced in quality control of pumps, compressors, turbines, gearboxes, motors, and other rotating
equipment, with focus on drawings, ITP, procedures, codes, and specifications.
Skilled in material inspection, dimensional checks, shaft/coupling alignment, soft foot, base plate
inspection, preservation, and final documentation.
Committed to maintaining high-quality standards, ensuring compliance with project specifications, and
delivering safe and reliable equipment installation.
EDUCATIONAL QUALIFICATION:
⢠Polytechnic in Mechanical Engineering from Al jadoon technical institute, Karachi Pakistan
PRESENT WORK EXPERIENCE: - (5 YEARS)
Name of Organization: - Hamon
Designation: - Mechanical Rotating Engineer
Project: - Advance Petrochemical Plant
Duration: - August 2025 To September 2026
Name of Organization: - Expertise Contracting Company Ltd
Designation: - Rotating Inspector
Project: - Hadeed Plant
Duration: May 2024 to April 2025
Name of Organization: - ARCC
Designation: - Mechanical Rotating QC
Project: - Marafiq Plant
Duration: - March 2022 to January 2024
ROLES AND RESPONSIBILITIES: ROTATING QC INSPECTOR
⢠Inspect installation of rotating equipment including pumps, compressors, turbines, gearboxes, motors, and
fin-fan equipment as per approved drawings, ITP, specifications, and project requirements.
⢠Perform foundation, base plate, sole plate, shims, leveling, soft-foot, and equipment installation
inspections.
⢠Carry out shaft, coupling, parallel and angular alignment, including preliminary and final alignment, using
dial gauge/laser alignment tools.
⢠Inspect suction and discharge piping, equipment nozzle orientation, flange alignment, gasket installation,
bolt tightening/torquing, and pipe strain.
⢠Visual Inspection: Check valve body, bonnet, flange faces, casting defects, cracks, corrosion, and physical
damage.
⢠Material Verification: Verify material grade, heat number, MTC, and traceability as per approved
specifications.
⢠Dimensional Inspection: Check face-to-face dimensions, flange rating, size, and pressure class against
approved drawings and applicable standards.
⢠Pressure Testing: Verify shell test and seat leakage test results as per the applicable standard and approved
ITP.
⢠Functional Inspection: Check valve opening/closing, stem movement, handwheel or actuator operation,
and flow direction where applicable.
⢠Review ISO drawings, equipment drawings, vendor drawings, datasheets, and applicable specifications
before and during installation.
⢠Conduct Material Receiving Inspection (MRI/MRIR) and verify MTCs, material identification, quantity,
dimensions, damage, and certificates.
⢠Inspect bolts, nuts, washers, gaskets, shims, and other installation materials against approved
specifications and MTCs.
⢠Inspect pump final alignment, coupling condition, coupling gap/DBSE, shaft runout, soft foot, and record
alignment readings.
⢠Inspect compressors, turbines, gearboxes, motors, pumps, and other rotating equipment for installation,
alignment, lubrication, and preservation requirements.
⢠Inspect Fin Fan/air cooler installation including Fan Hub, Blade Pitch Angle, Tip Clearance, Shaft
Alignment, Belt Tensioning, Borescope Inspection, guard, and rotation direction.
⢠Verify equipment preservation, cleanliness, lubrication, tagging, and protection against contamination or
damage.
⢠Raise and close NCRs, inspection requests, punch points, and quality records and maintain complete
inspection documentation.
⢠Coordinate with client/consultant, vendor, construction, and commissioning teams for inspection, testing,
and final acceptance.
CORE SKILLS:
⢠Mechanical Rotating Equipment Inspection
⢠API 686, API 610, API 682, API 598, API 600 & ASME Standards
⢠Pump, Compressor & fin fan, lube oil, valve, make up unit Installation Inspection
⢠Rotating Equipment Alignment & Soft Foot Inspection
⢠Foundation, Base Plate & Grouting Inspection
⢠Flange Inspection, Bolt Torque & Gasket Verification
⢠Shaft Alignment (Rim and Face or Reverse Alignment & Dial Indicator)
⢠Dimensional Inspection & Mechanical Tolerance Verification
⢠Mechanical Completion (MC) & Punch List Clearance
⢠Inspection Test Plan (ITP) & Method Statement Review
⢠Material Receiving Inspection (MRI)
⢠Quality Documentation, IRs, RFI, NCR & QC Reports
⢠Pre-Commissioning & Commissioning Support
⢠Vendor Package Inspection & Preservation
⢠Calibration Verification of Measuring Instruments
⢠Root Cause Analysis & Corrective Actions
⢠Excellent Communication, Teamwork & Problem-Solving
PERSONAL DETAILS
Religion : Islam
Marital Status : Single
Nationality : Pakistan
Language known : English, Hindi, Urdu
COMPUTER SKILL:
⢠MS-Office (Word, Power Point, Excel)
DECLARATION:
I hereby declare that all the above information given is true and correct to the best of my knowledge.
(SYED MUHAMMAD SHOAIB)