Dear Manpower Suppliers,
With reference to our ongoing projects in Jeddah and Yanbu, we are looking for reliable and experienced manpower suppliers who can provide the required workforce on an urgent basis.

Please review the following manpower requirements and documentation requirements and share your availability, best rates, and mobilization timelines.

1. Yanbu Project – Manpower Requirement
Position Nationality Quantity
Labor (Full Manual Excavation) Pakistani 25
(Single best option; if not then Multiple 3 to 5 sponsors)
Project Duration: 3–6 Months

*****************************************

2. Jeddah Project – Manpower Requirement (Multiple Sponsor Acceptable)
Position Quantity Selection Requirements
Mechanical / Piping Supervisor 5 CV & Interview
Mechanical/ Piping Foreman 5 CV & Interview
Piping Fabricator 5 CV & Interview
Piping Fitter 5 CV & Interview
Helper 10 —
Flagman 5 —
Fire Watchman 5 —
3. Mandatory Documentation Requirements
The following documents must be available for all manpower proposed for both projects:

Valid Medical Insurance & Report.

Valid Muqeem Report.

Chamber

Digital Iqama and Physical Iqama with matching details.

Minimum 5 months of Iqama validity.

Valid Commercial Registration (CR) of the employee

Please ensure that all documents are valid and available before submitting the manpower for mobilization.

Project Duration: 3–6 Months and extendable

4. Jeddah Project – Scope of Work (Fire Fighting System)
The project mainly involves the following activities:

A. Underground HDPE Fire Fighting Works

HDPE pipe laying, jointing and installation.

Installation of fire hydrants, fire hose reels and fire monitors.

Installation of Post Indicator Valves (PIVs).

B. Above-Ground Fire Fighting Works

GI piping installation and fitting works.

Installation of open-head sprinklers at work-at-height locations.

Pipe rack installation and associated structural support works.

Header piping installation on pipe racks.

Spool identification, selection, fabrication and installation.

Hydrostatic pressure testing of the piping system.

5. Required Technical Experience – Jeddah
As this project falls under the Oil & Gas sector, we specifically require technically sound and experienced piping professionals with practical Fire Fighting project experience.

The Mechanical Piping Supervisor / Piping Engineer must have good working knowledge of:

Piping Isometric Drawings.

Piping Plan Drawings.

P&ID (Piping and Instrumentation Diagrams).

Spool identification, selection and installation.

Piping routing, fittings, supports and tie-in locations.

Execution and coordination of underground and above-ground piping activities.

Hydrotesting procedures and inspection requirements.

Important: The selected piping professional must have practical Oil & Gas field experience and the ability to independently read and interpret engineering drawings and coordinate the execution of Fire Fighting piping activities at the project site.

6. Supplier Response

Interested manpower suppliers are requested to share the following:

Available manpower details and confirmation of quantities Maximum by Tomorrow before 05:00 PM.

Updated CVs for positions requiring client interviews Maximum by Tomorrow before 05:00 PM.

Confirmation of mandatory documentation availability.

Best commercial rates.(By tomorrow Before 03:00 PM)

The payment terms and conditions shall be considered after invoice 45 Days only.

Earliest possible mobilization timeline.

Confirmation of manpower nationality.

Mobilization is under the Supplier's scope, and reimbursement shall be given upon the agreed rates after arrival at respective locations.

Accommodation and Transportation is our scope and Food shall be compensate through monthly allowance.

We are looking for reliable suppliers with the capability to arrange the required manpower within the project timelines and maintain workforce availability throughout the project duration.

Email operation.support@coastalel ...

Your prompt response and cooperation will be highly appreciated
वापस आगे