SUB CONTRACTORS REQUIRED FOR BUILDING & CIVIL WORKS

SUB CONTRACTORS REQUIRED FOR BUILDING & CIVIL WORKS

Location: Riyadh, Saudi Arabia
Company: HARTCCO
Project Type: Building Construction & Civil Works

We are currently inviting qualified Subcontractors, Individual or Small Establishments (Moasasa):

1. Substructure & Civil Works
• Site Preparation & Excavation: Earthworks, site clearing, trenching, and leveling.
• Substructure Waterproofing: Foundation tanking, bitumen membrane application, and damp-proofing.
• Reinforced Concrete Foundations: Rebar tying, formwork, and foundation concrete pouring (Raft/Footings).
• Backfilling & Compaction: Backfilling in layers with mechanical compaction and soil testing compliance.
• Grade Slab (Ground Slab): Sub-slab vapor barrier installation, mesh rebar, and slab-on-grade pouring.
• Columns & Core Walls: Vertical element shuttering, steel fixing, and concrete casting.
• Formwork & Shuttering: Scaffolding setup, slab shuttering, and structural framing erection.
• Slab Steel & MEP Embedments: Rebar mesh fixing and pre-pour electrical/plumbing sleeve coordination.
• Concrete Pouring & Curing: Ready-mix concrete placing, vibration, and chemical/wet curing protocols.
• Blockwork / Masonry: Concrete block laying (20cm/15cm), lintel casting, and tie-beam construction.

2. Finishing & Architectural Works (Tashtibat)
• Plastering: Internal wall rendering, external facade cement plastering, and mesh installation.
• Gypsum Ceilings: Suspended plasterboard ceilings, perimeter coving, and light trough installation.
• Painting: Interior primer, wall putty, emulsion coats, and exterior textured profile painting.
• Waterproofing Wet Areas: Liquid-applied membrane waterproofing for bathrooms, kitchens, and balconies.
• Flooring & Tiling: Porcelain/ceramic floor tiling, wall cladding, screed application, and skirtings.
• External Cladding & Windows: Aluminum profile fabrication, glass curtain walls, and exterior facade installation.

3. MEP Subcontracting Works (First-Fix & Second-Fix)
• Electrical First-Fix: Wall chasing, conduit piping, DB box placement, and floor box embedding.
• Plumbing First-Fix: PPR water supply lines, PVC drainage stacks, and concealed fixture bodies.
• HVAC First-Fix: Concealed ducted/split unit bracket mounting, copper piping, and sheet metal ducting.
• Plumbing & Electrical Fixtures (2nd/3rd Fix): Sanitaryware mounting, lighting fixtures, switches, sockets, and DB terminations.


Contact Person Name, Mobile Number, and CR Copy to:


Email: [email protected]



Kembali Seterusnya