Transmission equipment manufacturers, engineering contractors and renewable-energy developers can monitor a proposed Green Energy transmission project associated with Leh's renewable power evacuation infrastructure.
The National Committee on Transmission has recommended implementation of the Green Energy transmission project through POWERGRID under the regulated tariff mechanism.
Estimated total cost: ₹31,427.54 crore.
Renewable integration capacity: 7.5 GW.
Continuous evacuation capability: 3.75 GW.
Part I: 2,000 MW, estimated ₹25,225.87 crore, with a 48-month implementation period from award.
Part II: Additional 1,750 MW, estimated ₹6,201.67 crore, with a 60-month implementation period from award.
Major infrastructure includes Pang and Sundar Nagar substations, two double-circuit 400 kV lines and nine synchronous-condenser units at Pang.
Solar and battery installations must incorporate 100% grid-forming inverters.
Further technical studies are required.
EnergylineIndia.com covers this Green Energy transmission project recommendation for stakeholders following Inter State Transmission System infrastructure.