The required duration is three months, with an anticipated start in December 2026.
- Posted by: [email protected]
- Member since: October 2025
- Posted:
- 类别: 职位
- 地区: 朱拜勒 (JUBAIL)
- 发布 ID: 64697353
Work Permit Receiver (WPR) for our CO₂ system installation project at Khursaniyah Gas Plant.
The required duration is three months, with an anticipated start in December 2026.
The required duration is three months, with an anticipated start in December 2026.