Safety Officer / WPR (Aramco Approved With Ajeer) Rental

Please find below our manpower requirement for the upcoming shutdown project at KHURAIS ARAMCO. Candidates must have prior Oil & Gas plant experience. The interview selection ratio will be 6 candidates selected out of 10 interviewed (6:10).
1. ARAMCO MECHANICAL QC - CV & API 570 & ARAMCO APPROVAL CERTIFICATION REQUIRED
2. ARAMCO WELDING QC - CV & CSWIP 3.1 & ARAMCO APPROVAL CERTIFICATION REQUIRED
3. ARAMCO WPR - CV & ARAMCO APPROVAL CERTIFICATION REQUIRED
4. ARAMCO SAFETY OFFCIER - CV & ARAMCO APPROVAL CERTIFICATION REQUIRED
5. STANDBY MAN - TUV CARD REQUIRED
6. SCABA MAN - TUV CARD REQUIRED
7. FIREWATCH TUV - TUV CARD REQUIRED
8. FLAGMAN TUV - TUV CARD REQUIRED
9. ARAMCO OPERATOR FORKLIFT - ARAMCO APPROVAL CERTIFICATION REQUIRED
10. DRIVER LIGHT – 1
11. FABRICATOR – 2
12. FITTER – 10
13. ARAMCO JCC WELDER – 12
14. HELPER – 20
15. ARAMCO RIGGER III - ARAMCO APPROVAL CERTIFICATION REQUIRED
16. ELECTRICIAN – 2
17. MECHANICAL TECHNICIAN – 4
18. ABLUTION CLEARNER – 1
19. GRINDER MAN – 6
20. DOCUMENT CONTROLLER – CV Require
21. PROJECT COORDINATOR – CV require
Project Duration:
2 Months + 1 Month Extendable
Project start date in 1st week of Dec. 2026
Tentative mobilization is scheduled for the last week of November 2026; however, it remains subject to final ARAMCO approval and confirmation.
Terms & Conditions
1. Safety Orientation will be conducted in Khurais. All personnel must carry a minimum one-year valid Medical Certificate (color copy).
2. Complete documentation is required with a minimum validity of 90 days. AJEER and Chamber documents are mandatory.
3. In case of standby, a minimum of 8 working hours will be charged. If deployed, a minimum of 10 working hours will be applicable, and any additional hours will be treated as overtime (OT).
4. Mobilization and demobilization will be under the supplier's scope. Food, Accommodation, and Transportation (FAT) will be provided by Client.
5. All required TPI certificates along with physical ID cards must be available.
6. Mobilization will be permitted only after submission and approval of complete documentation.
7. Any unethical activities, misconduct, or participation in strikes during the shutdown period will result in timesheet deductions and may lead to immediate removal from the project.
8. Supplier must ensure manpower availability throughout the shutdown period without interruption.
9. Timesheet will start after mobilization at site or camp in KHURAIS.
Interested candidates send their documents at [email protected]


Bumalik Susunod