 Cost Estimation & BOQ Preparation:

I'm Shaik Faiazuddin, CEO of Expert Contracts. I bring over 35 years of international experience gained across Saudi Aramco, Bechtel, SABIC, Qatar Petroleum, and other major global EPC organizations, and I've built Expert Contracts around getting the numbers right from the very first stage: accurate, defensible estimation and BOQ preparation. Backed by a dedicated office and an in-house team of qualified professionals, every estimate we produce is handled directly by our own people, from quantity take-off to final pricing.

Most cost overruns and disputes don't start on site — they start at tender stage, with a BOQ that's incomplete, quantities that don't match the drawings, or an estimate that leaves no room for the realities of execution. That's the gap we close.

 Where we support contractors:

• Bill of Quantities (BOQ) preparation – detailed quantity take-off from drawings and specifications, structured to tender or contract requirements
• Cost estimation – material, labour, equipment, and overhead pricing built on current market rates
• Tender estimation – full cost build-up to support competitive, defensible bids
• BOQ review and verification – checking a received BOQ against drawings and specifications to catch discrepancies before they become disputes
• Rate analysis – breakdown and justification of unit rates for negotiation or claim support
• Variation and change order pricing – quantifying and pricing scope changes with proper backup
• Cost-to-complete and budget tracking – ongoing estimation support through project execution

 How we work:

We start with a careful review of your drawings, specifications, and scope to make sure nothing is missed at the take-off stage — an accurate BOQ is only as good as the quantities behind it. From there we build the pricing using current, market-tested rates, and structure the output so it stands up whether it's used for a tender submission, an internal budget, or as backup for a future variation or claim.

We work with contractors and subcontractors across all regions of the Kingdom, on projects of varying scale, and we're equally comfortable building an estimate from scratch or reviewing and correcting one that's already been prepared.

If you need a BOQ built properly, an estimate you can rely on, or a second opinion on numbers you've already been given, reach out and we'll walk through it.

 Expert Contracts:
📧 [email protected]
📱 +966 53 594 6638
🌐 https://expertcontracts.ca/
CR: 7053779828

Riyadh, Job Seekers, Estimation & Bill Of Quantities (BOQ) Riyadh, Job Seekers, Estimation & Bill Of Quantities (BOQ)
Retour Suivant